Operation steps of central drive secondary sedimentation tank reducer

Mondo Technology Updated on 2024-01-29

The operation steps of the central drive secondary sedimentation tank reducer are as follows:

1.Make sure the appliance is installed correctly and has been adequately flushed. Confirm that the main components such as the motor and bearings are in good condition. Check whether the fasteners are firm and reliable. The lubrication part should be regularly oiled to prevent dry grinding. Doing a good job of leakage prevention can effectively avoid the accumulation of pollutants. After adjusting the slag scraping device to ensure the sedimentation effect.

2.Before starting, an inspection should be carried out, including the inspection of the motor, bearing, chain and the filling of the oilThen carry out a no-load test to check that the operation condition is normal and then load it gradually.

3.In the process of use, the parameters should be adjusted according to the instructions to ensure the treatment effect, such as the speed should be adjusted in time to maintain the constant working efficiency of the pump when the load changesDuring commissioning, it is necessary to set a suitable diffuser speed, etc. 4. The shutdown should also be carried out in the order of first breaking the forward button and then powering off, so as not to affect the subsequent operation or cause damage to the equipment.

5. Because sewage may cause the motor to burn, it is necessary to conduct regular inspections, and at the same time make maintenance records. For example, information such as what fault was replaced, what was changed, and when it was broken, so as to facilitate later maintenance. The above information is for informational purposes only and is recommended for inquiries to obtain information. And please pay attention to follow the safety regulations and recommendations during the use of the machine, and follow the correct operating procedures to ensure the safety of equipment and personnel.

Related Pages