Summary of labor costs of construction engineering teams**: It is recommended to collect.
1. Rebar: 50 yuan square.
2. Carpentry: 35 yuan square.
3. Concrete: 15 yuan square.
4. Outer erector: 18 yuan square.
5. Plumber: 36 yuan square.
6. Masonry: 180 yuan cubic meter.
7. Interior wall plastering: 12 yuan square.
8. Exterior wall plastering: 18 yuan square.
9. Tile paving: 38 yuan square.
10. Stairwell latex paint: 14 yuan square.
11. Stair tread plastering: 25 yuan step;
12. Polypropylene waterproof two: 7 yuan square;
13. SBS waterproof two: 14 yuan square;
14. Aluminum alloy window production and installation: 38 yuan square;
15. Fire door production and installation: 65 yuan square;
16. Stair railing production and installation: 38 yuan meters;
17. Lightweight brick wall: 35 yuan square;
Pat the fireworks around you The above ** is for reference only, and the actual ** may vary depending on the region, the amount of work, labor costs and other factors. In construction projects, labor costs are an important part of the entire project cost, accounting for a large proportion of the entire project cost. Therefore, it is of great significance to understand the composition and calculation of labor costs to control project costs and ensure the economic benefits of the project. At the same time, when selecting the construction team and workers, it is also necessary to pay attention to their skill level and work efficiency to ensure the construction quality and progress of the project.