Qilu.com Lightning News, February 13 The beginning is a decisive battle, and the start is a sprint. In January 2024, Shengli Oilfield overcame unfavorable factors such as low temperature, rain and snow, anchored the goal, compacted the responsibility, tightened the rhythm, accelerated the operation, and produced **199830,000 tons, an increase of 1 year-on-year190,000 tons; Production of natural gas 07.3 billion cubic meters, 01.1 billion cubic meters, all indicators exceeded the planned operation, to achieve a "good start" in production and operation.
Ensuring national energy security is the "great power of the country", and it is also the "important thing of the enterprise" of Shengli Oilfield. In 2024, on the basis of a stable production of more than 23.4 million tons for many consecutive years, the oilfield will continue to increase exploration and development efforts, and put forward the goal of producing 23.58 million tons, making every effort to expand oil and gas resources, promote the increase of reserves and production, and achieve economies of scale and stable production, so as to provide victory support for a more stable and better energy job.
* Production is the ballast stone of high-quality development, and the oilfield has comprehensively strengthened production organization and optimized operation, so as to win the initiative in production with the initiative in operation. In January, the construction of oilfield production capacity ran out of "acceleration", effectively accelerated the preparation and optimization of the implementation of new well plans, did a good job in well deployment in advance, did a good job in safety assessment and environmental assessment, contract signing, accelerated pre-drilling construction, drilling rig relocation organization and operation, reduced the responsibility for lost work and non-production and other downtime, comprehensively improved the operation efficiency of drilling rigs, 2 exploration wells were delivered, 95 new wells were put into production, and the production capacity exceeded 140,000 tons. Focusing on the goal of "fewer wells and higher production", the oilfield continued to expand the scale of efficient construction and production, implemented 124 implementable development plans, implemented a production capacity of more than 2 million tons, and had thousands of well reserves.
Flash News reporter Chen Haitao, Shenglitai, Zhang Yufeng, Dongying report.