The road is stretching, and the city is growing.
In the middle of winter, overlooking from the sky, a wide and flat asphalt road stretches straight into the distance, connecting the core area of the Western (Chongqing) Science City and Jiangjin District, making the traffic smoother.
Science Avenue Phase II Bid 1. Photo by Lei Jian.
Science Avenue is an urban expressway in Science CityIt is connected to the north bridgehead of the Zhiping Yangtze River Bridge in the south and the south bridgehead of the Jialing River Bridge in Beibei in the northAfter completion, the 66-kilometer avenue is the central axis of the development of Science City.
Schematic diagram of Science Avenue. Figure **Network.
Among them, the first section of the second phase of Science AvenueFrom the south of the Bafu Interchange in the south to the south of the Nongma Interchange in the north, it is an urban expressway with 8 lanes in both directions of the main line, the two-way road width structure of 6 5 lanes, the main line design speed of 80 kilometers per hour;The auxiliary road is an urban secondary trunk road with a design speed of 40 kilometers per hour.
Section 1 of the second phase of Science Avenue starts from the south of Bafu Interchange in the south to the south of Nongma Interchange in the north. Photo by Lei Jian.
After the completion of the project, the university town will drive to Jiangjin Shuangfu, and at the same time, you can choose not to take the expressway (starting from Pingshan Avenue and arriving at Shuangfu through Science Avenue to Jiujiang Avenue), saving 9 yuan in tolls.
On January 3, the reporter saw at the construction site of the first bid section of the second phase of Science Avenue that the traffic markings of the main road have been delineated, the traffic lights have been installed in place, and the construction personnel are working on the auxiliary roads and road supporting facilities. "At present, the main line of the first section of the second phase of Science Avenue has been basically completed and will be put into use in the near future. Yang Boxiao, the on-site representative of the urban construction group under the high development group, said.
The main line of the first section of the second phase of Science Avenue has been basically completed. Photo by Lei Jian.
At that time, it will further open up the traffic artery of the Science City, improve the road capacity, and make the regional road network smoother, which is of great significance to enhance the development potential of the surrounding areas.