What are the contents of the technical preparation of prefabricated building construction and the 5

Mondo Social Updated on 2024-02-20

What are the contents of the technical preparation of prefabricated building construction and the 5 contents of technical preparation?

1. Familiar with and review the construction drawings and related design informationThis includes the splitting of the floor laminated panel units on each floor and the selection and finalization of the prefabricated partition wall, the determination of the geometric dimensions of each slab, the concrete pouring thickness and strength of the laminated layer, the arrangement of the steel bars and other relevant technical parameters, as well as the prefabricated slab and wall construction process. In addition, it is necessary to analyze and determine the engineering safety risk level existing in the construction process, and do a good job in the safety special plan and safety training disclosure.

2. Conduct investigation and analysis of original dataThis includes understanding the actual situation of the construction site, such as topography, landform, geological conditions, meteorological conditions, traffic conditions, etc., in order to provide a basis for the formulation of the construction plan.

3. Preparation of construction organization designThis includes determining the construction sequence, construction method, construction machinery, labor organization, construction schedule, etc., to ensure the smooth progress of the construction process.

4. Summarize and discuss drawing problemsBefore the start of construction, the project engineer will convene all relevant personnel to conduct a detailed review and discussion of the drawings, effectively solve the difficulties and effectively implement the contradictions encountered in the construction of the drawings on site.

5. Do a good job of technical disclosureDo a good job of technical disclosure to workers and other construction personnel, and carry out technical disclosure step by step in accordance with the requirements of the first technical disclosure procedure, especially for different types of technical work. After each design disclosure, it should be effectively strengthened and implemented.

In general, the technical preparation of prefabricated building construction is to ensure the smooth progress of the construction process, improve the efficiency and quality of construction, and ensure the safety of workers. **Ten Thousand Powder Incentive Plan How to be a qualified builder, the ability of a qualified builder in 4 aspects.