What do you need to pay attention to in the qualification review of bidding applicants?

Mondo Social Updated on 2024-03-01

Qualification review of bidding applicants is required.

What to pay attention to.

Under normal circumstances, the tenderer can request a qualification review in the bidding documents or invitation to bid.

1. Qualification review method

The qualification review is generally divided into pre-examination and post-examination, with pre-examination before bidding and post-examination after bid opening. The method to be used for qualification review is generally decided based on the scale of the project, complex procedures, technical requirements and the number of bidders.

Second, the content of the qualification review

1) The right to conclude contracts independently.

2) Ability to perform the contract.

3) No bad behavior and being punished by the state.

3. Qualification criteria

The pre-qualification criteria should be specified in the prequalification documents, and the post-examination criteria should be specified in the bidding documents.

4. Limit the exclusion of bidders

In the following circumstances, it is an illegal restriction and exclusion of bidders by the tenderer.

1) Provide different information to different bidders.

2) Set qualifications, technical and other requirements that are not suitable for the scale and characteristics of the project.

3) Take the performance of a specific region or industry as a bonus condition or bid winning condition (note: there is no bidding condition).

4) Adopt different standards for different bidders.

5) Differential treatment of bidders with different ownership systems.

6) Illegally setting enterprise scale conditions and financial indicators that exceed the actual needs of the project.

7) Set competency and qualification requirements that exceed the needs of the project.

8) The honorary awards and charity certificates given by the ** departments and industry associations will be used as bidding conditions and bid-winning conditions (note: there are no conditions for adding points).

9) Illegally requiring the establishment of a subsidiary, branch or institution in the local area, having a certain business area and paying social security locally, etc.

10) For those who only need to prove the relevant qualifications and can provide copies, the originals must be required, and those that can provide electronic licenses must be paper-based.

11) Limit the bid bond and performance bond to be submitted only in cash, or not return the bond in accordance with the regulations.

12) Simply take the business scope recorded in the business license as the basis for business qualification (it must be based on the administrative license of the ** department or the relevant qualification certificate obtained, or the specific content of the administrative license recorded in the business license).

Article recommendation

What is included in the whole process of cost consulting?

Beware of losses: Is the deposit in the bidding necessary to be returned, and which circumstances are not refundable?

Similarities and differences between prequalification and bidding documents.

The most important part of the bidding - the bid evaluation link: you should collect and remember.

Valuation of construction changes in engineering projects.

Related Pages