Specifications of 3500M3D integrated rainwater lifting pumping station with daily processing capacit

Mondo Social Updated on 2024-03-01

Specifications of 3500m3 d integrated rainwater lifting pumping station with daily processing capacity.

1. Overview. The integrated rainwater lifting pumping station is a pumping station facility that integrates various functions such as water pump, sewage lifting, grid, control system, etc., which is mainly used to collect and treat rainwater to prevent urban waterlogging and environmental pollution. Among them, the integrated rainwater lifting pumping station with a daily treatment capacity of 3500m3 d is a relatively common specification, which is suitable for rainwater treatment in medium and large cities or regions.

2. Specifications.

1.Processing capacity: 3500m3 d (per day).

2.Pumping station structure: integrated FRP material.

3.Quantity and model of water pump: according to the actual situation, generally 2-4 sets.

4.Grille: automatic or manual control to intercept debris.

5.Control system: automatic control system, remote control.

6.Supporting equipment: transformers, distribution cabinets, cables, etc.

7.Pumping station size: determined according to the actual situation, generally not more than 10m 5m 3m

8.Mode of operation: continuous or intermittent operation.

9.Scope of application: It is suitable for rainwater treatment in various places such as residential quarters, commercial areas, and industrial areas.

3. Technical requirements.

1.The pumping station should have a high processing efficiency to ensure that the processing task is completed within the specified time.

2.The pumping station should have good sealing performance to prevent sewage leakage.

3.The pump should have a high head and flow rate to meet the lifting requirements.

4.The grille should be able to intercept larger debris and ensure the normal operation of the pump.

5.The control system should have remote control and automatic control functions to facilitate operation and maintenance.

6.The pumping station should have good anti-corrosion and anti-seepage performance to ensure long-term stable operation.

7.The pumping station should consider energy saving and environmental protection, and adopt high-efficiency, low-noise pumps and energy-saving supporting equipment.

Fourth, installation and use requirements.

1.Foundation construction should be carried out before installation to ensure that the ground is flat and firm.

2.The installation should be carried out in accordance with the drawings and technical requirements provided by the manufacturer to ensure the horizontal and vertical degree of the pumping station.

3.When using, it should be carried out in accordance with the operating procedures to avoid misoperation.

4.The pumping station should be inspected and maintained regularly to ensure normal operation and service life.

5.Attention should be paid to safety during use to avoid loss of personnel and property.

Related Pages