After the year, the construction site inspection will start again! Focus on details to create high q

Mondo Home Updated on 2024-03-07

Sampling location]: Dormitory of the University of Finance.

Construction Update]: Carpentry completed.

Gypsum board seals, it is forbidden to splice them with small pieces.

The top is required to be fixed with expansion bolts.

The surface layer at the 90° corner of the gypsum board needs to be L-shaped.

The gypsum board sealing board requires that the joints are V-shaped openings of about 5mm.

Sampling location]: Nursery community spring.

Construction Update]: Oilman inspection.

Brush the primer after sanding.

Brush the topcoat.

Repeat the topcoat twice.

Acceptance criteria before painting:

1. After the top angle line plaster is leveled, the baseboard putty is scraped to the ground, and the 2 meters are detected by a ruler of 2 mm.

2. The yin and yang angles need to be embedded with right-angle strips, the yang angles are vertical, and the straightening error of the yin angles is 1Within 5 mm.

3. All slotted places and seams are treated with grid and kraft paper.

4. Door covers, window covers, and passes, horizontal and vertical lines need to be made.

Sampling location]: MCC Liyuan.

Construction Update]: Groundbreaking Ceremony.

Groundbreaking Ceremony Preparations:

Banners, hammers, tables, red tablecloths, red carpets, drinks, salutes, fire extinguishers, responsibility supervision signs, safety signs.

Safety signs: play the role of safety precautions, standardize the material placement area, reduce the occurrence of safety accidents and ensure that the on-site materials are placed in a neat and orderly manner.

Related Pages