In construction engineering, reinforcement engineering is a very important part. It is not only related to the overall stability and safety of the building, but also directly affects the quality and service life of the project. However, in the process of supervision, we found some hidden problems in the reinforcement project, which will bring serious consequences to the whole project if they are not dealt with in time.1. The garbage in the shear wall has not been cleaned up.
Shear walls are one of the main load-bearing structures of a building, and their interiors should be kept clean and free of any clutter. However, during this inspection, we found that there was garbage in the shear wall that had not been cleaned up. This can lead to a decrease in the load-bearing capacity of the shear wall and even a safety hazard such as cracks.
Second, the height of the anti-waterproof steel plate in the bathroom is not left in place.
Restrooms are one of the most leak-prone areas in buildings, so the height of the anti-waterproof steel plate is very important. If the height of the anti-waterproof steel plate is not left in place, it will lead to leakage in the toilet and affect the use function.
Third, the wall casing appears inverted slope.
The wall casing is set up to facilitate the pipe to pass through the wall, and if there is a inward slope, it will lead to poor drainage of the pipe, or even leakage. This will not only affect the use function of the building, but also cause damage to the wall structure.
Fourth, the length of the straight section of the stirrup hook is not enough.
Stirrups are an important part of fixing the reinforcement skeleton, if the length of the straight section of the stirrup hook is not enough, it will lead to the instability of the reinforcement skeleton, and it is easy to displace and other problems.
Fifth, the wall reinforcement is displaced.
The displacement of wall reinforcement will lead to the instability of the wall structure and the potential safety hazards such as cracks. Therefore, during the construction process, the position and spacing of the wall reinforcement must be strictly controlled to ensure that it meets the design requirements.
To sum up, although these problems may seem small, they are directly related to the quality and safety of buildings. Therefore, in the construction process, it is necessary to operate in strict accordance with the relevant norms and standards, strengthen the quality control and supervision and management of the reinforcement project, and ensure that the quality of the project meets the design requirements. At the same time, the supervision unit should also conscientiously perform its duties, strengthen the supervision and inspection of the construction process, find and deal with problems in a timely manner, and ensure the quality and safety of the project. Only in this way can we provide people with a safe and comfortable living environment.